The zone rules systems out before the client has looked at a single quote. It only says what is excluded, never what may be used: with the restrictions verified, a list of prohibitions stays true where a list of permissions would be a trap.

Systems ruled out by seismic zone

The 1,122 municipalities and non-municipalised areas in the DIVIPOLA. Of these, 1,115 appear in appendix A-4, where the zone comes from; for the other 7, created or recoded after 2010, the tool says so.

While you choose the municipality.

m²

For the limits of Título E.

6 systems are ruled out

This is not table A.3-1. These are the restrictions that were verified by reading the code, which is why the tool only says what is ruled out and never what may be used.

Unreinforced masonry

Permitted only in a low seismic hazard zone where Aa is 0.05 or less, use group I, one and two storeys. It is the narrowest limit in the code, and Barranquilla and Cartagena already fall outside it with their Aa of 0.10.

NSR-10, Tabla A.3-1

Concrete shear walls, moderate energy dissipation (DMO)

Not permitted in a high seismic hazard zone.

NSR-10, Tabla A.3-1

Concrete shear walls, minimal energy dissipation (DMI)

Permitted only in a low seismic hazard zone.

NSR-10, Tabla A.3-1

Concrete moment frame, moderate energy dissipation (DMO)

Not permitted in a high seismic hazard zone.

NSR-10, Tablas A.3-1 a A.3-4

Concrete moment frame, minimal energy dissipation (DMI)

Not permitted in a high seismic hazard zone, nor in an intermediate one. It is the hard proof that the zone changes the design, not just the reinforcement.

NSR-10, Tablas A.3-1 a A.3-4

Infill masonry walls

Not permitted for new buildings. In no zone, with no exception for use group or height.

NSR-10, D.2.1.6

And if you were planning to design under Título E

On what you have answered, the case falls within the limits of Título E. Título E covers one- and two-storey houses in confined masonry and reinforced earth-and-cane construction, use group I, in schemes of at most 15 dwellings and under 3,000 m². Outside that, it is not that building is forbidden: it is that the design can no longer be done under Título E.

NSR-10, E.1.1.1.1, cross-referring to A.1.3.11

Steel framing is in the code: Título F, chapter F.4, cold-formed steel sections. It gets repeated a great deal that it is «outside the code», and it is not.

Where the zone comes from

Departmental capitals are in table A.2.3-2 and every other municipality only in appendix A-4. Citing the wrong table is a checkable mistake, and it is the one made when looking up a municipality that is not a capital.

These are the 1,117 municipalities of appendix A-4, extracted from the PDF of the code, not typed in.

Colombia has 66 municipality names that repeat, and 39 of those pairs do not share a seismic hazard zone. The extreme case is Mosquera: the one in Cundinamarca has Aa = 0.15 and sits in an intermediate zone; the one in Nariño has Aa = 0.50 and sits in a high one. That is why the search here goes by department and municipality, and cross-checks underneath by DANE code: a search by name alone would hand a project in Nariño a design acceleration three times lower than its own.

The seismic hazard zone is set by Av, not by Aa, and that is why some municipalities surprise you: Valparaíso, in Caquetá, has the lowest Aa in the country (0.05) and is still an intermediate zone, because its Av is 0.15. Reading the table by Aa would put it in a low zone and open up unreinforced masonry, which cannot be used there.

On cost, carefully

The NSR-10 does not mention cost anywhere. That a high seismic hazard zone makes a building more expensive is professional inference (reasonable, and ours), not a provision of the code. What the code does say is which systems are ruled out, and that happens before the client has looked at a single quote.

I have a plot and I want to build on it.

We check what the planning rules allow on your plot, what can be built and what it costs, before drawing anything. Then we develop the full project through to the drawings and the permit application with the curaduría (the licensed private office that issues building permits in Cali and other large Colombian municipalities; in smaller ones, the municipal planning office).