Amtrak · Richmond station stair
A complete stair for the station, installed in a 72-hour window.
Project data
- Code
- ARI
- Years
- 2024 to 2025
- Location
- Richmond, California, USA
- Client
- Amtrak
- What the team did
- Project management: design, procurement, logistics and installation, with site visits and supervision at critical stages
- Value
- USD 350,000
- Installation window
- 72 hours
- Status
- Installed
Inspection and fabrication. The inspection took place in 2024; fabrication and construction, in 2025. The project was postponed twice.
72 hours. With a schedule that tight, there were 72 hours to bring in the materials, install the stair, clean up and leave. The job lost its supervisor and the management team took over field supervision. The deadline was met.
Before
The original stair, between the platform and the underpass.
Fabrication and installation
The stair in the shop and its installation within the 72 hours, with the yellow-striped treads.
Do you have a project to manage or supervise?
The team manages, supervises and assesses construction in Colombia, the United States and the Caribbean. Tell us what you need and we will reply within 24 hours.