Skip to content
9.5 MW gas cogeneration plant, photo 1 of 3

9.5 MW gas cogeneration plant

Gas engine generation, control houses, fuel systems, equipment foundations and acoustic insulation of the engine hall.

2017   Colombia

Project data

Code
CVA
Years
2017
Location
Colombia
Client
Cementos Vallenato
What the team did
Full design, including the acoustic insulation, and consulting: management and delivery of the architectural design and full consulting on the technical studies
Value
USD 5M+
Size
9.5 MW
Status
Handed over to the client

Back to the projects table

Do you have a project to manage or supervise?

The team manages, supervises and assesses construction in Colombia, the United States and the Caribbean. Tell us what you need and we will reply within 24 hours.