Project management and design of the building’s permanent and temporary formwork, including the formwork for the nodes of the circular columns.

2017 to 2018   Bogotá, Colombia

Project data

Code
ATR
Years
2017 to 2018
Location
Bogotá, Colombia
Client
Consorcio PSE, Torre Atrio
What the team did
Project management and design of the permanent and temporary formwork
Value
USD 4M+
Scope
Formwork for the nodes of the circular columns
Status
Building completed

The orange nodes. The formwork for the nodes of the circular columns, left exposed on the façade, was designed and managed by the team.

From design to shop. Scope, drawings and fabrication schedule for the permanent and temporary formwork.

The tower under construction · Drawing of a permanent form for a circular column (isometric views).